X-Linked Type

Bored Pile Grab

Bored Pile Grab

  • Discharging of the grab jaws is rapid and easy, besides maximum capacity of grabbing.
  • The hammer grab is the most important tool in pile construction and it determines the drilling progress.
  • The entire construction is stress relieved and extremely strong.
  • Surfaces exposed to abrasion are manufactured by Hadox 500 material.
  • Chassis and arms that required endurance are manufactured by Weldox 700 material.
  • Guide and holders are manufactured by S 355 material.
  • Presented as two different systems as follows:
    • Pulley System
    • X-Linked Sytem
TypeJaws Opening (mm)Length (mm)CapacityWeight
ZKL 1000100040004503500
ZKL1200120044006004500
ZKL1300130045008506800
ZKL15001500470011007400
ZKL16001600497012507900
ZKL18001800543017009600
ZKL200020005600180010000
ZKL220022005700190012300
ZKL250025006830240014000
Document Name Date Show
Description Date Play